Preparation:
Before use of this product we recommend where possible to square the repair off then use a wire brush to clean the area then proceed to vacuum the area to get rid of any loose materials, dust and dirt. If it's not possible to square the repair off, use a wire brush to clean the area out & vacuum to remove dust & dirt.
Application Conditions:
Do not apply outside of the range 10 °C to 25 °C. Localised heating or cooling equipment may be required outside this range to achieve ideal temperature conditions.
Application:
1. Pour the entire content of part B in to your part A tin
2. Mix thoroughly using a drill & paddle for 2 minutes
3. Begin to apply the tack coat to your area with a stiff brush working well in to the surface and edges of the repair are
4. Overlaying of subsequent mortar must be done when the product is tacky (6 - 8 hours). If that's not possible the mortar can be applied whilst the tack coat is still wet (approximately 30- 60 minutes at 15ºC - 20ºC but this will be extended to 3 hours at 5ºC)
5. Once complete wash equipment with warm, soapy water